{"title":"Home page","description":null,"products":[{"product_id":"gutter-installation","title":"Revised Balance Gutter Installation","description":"\u003cp\u003eGutter Installation \u003c\/p\u003e\n\u003cp\u003einstall new gutter system w\/ leaf guards \u0026amp; 2 years of free maintenance doing routine checks every 3 months ! \u003c\/p\u003e","brand":"Homeowners","offers":[{"title":"Default Title","offer_id":52423228522772,"sku":null,"price":1875.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/1008\/1707\/6500\/files\/IMG_0301.jpg?v=1777648366"},{"product_id":"services-example-product-3","title":"Revised Invoice","description":"\u003cp\u003e\u003cstrong\u003e\u003cspan style=\"text-decoration: underline;\"\u003e\u003cem\u003eELIMINATES PRO SOLUTIONS\u003c\/em\u003e\u003c\/span\u003e\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003e\u003cspan style=\"text-decoration: underline;\"\u003e\u003cem\u003eGeneral Contracting \u0026amp; Exterior Services\u003c\/em\u003e\u003c\/span\u003e\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003e\u003cspan style=\"text-decoration: underline;\"\u003e\u003cem\u003eVirginia Beach, VA 23462\u003c\/em\u003e\u003c\/span\u003e\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003e\u003cspan style=\"text-decoration: underline;\"\u003e\u003cem\u003ePhone: | 757-639-1180\u003c\/em\u003e\u003c\/span\u003e\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eGutter Installation (Revised)\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOriginal gutter install was quoted at\u003cem\u003e $3,000\u003c\/em\u003e, was then reduced to\u003cem\u003e $2,850\u003c\/em\u003e. Half was paid up front in the amount of\u003cem\u003e $1,425\u003c\/em\u003e by Mr. Walter Brower. After starting installation an unexpected issue arose. The additional cost came up to $\u003cem\u003e1,335.00\u003c\/em\u003e. Making the new balance \u003cem\u003e$4,185. $700\u003c\/em\u003e of that was paid in cash by Mr. Walter Brower. And additional $600 was paid also. Total amount paid thus far by Mr. Brower is \u003cem\u003e$2,725 \u003c\/em\u003e. That leaves a remaining balance of \u003cem\u003e$1,460. \u003c\/em\u003eBelow are the details and revised cost breakdown:\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cspan style=\"text-decoration: underline;\"\u003e\u003cem\u003e\u003cstrong\u003eINVOICE ADDENDUM - ADDITIONAL REPAIR WORK\u003c\/strong\u003e\u003c\/em\u003e\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cspan\u003eRequired Structural Repairs Prior to Gutter Installation:\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cspan\u003eDuring gutter installation preparation on the one-story A-frame home, it became apparent that gutters could not be properly attached to original exterior walls. To fix this the following was required…\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cspan style=\"text-decoration: underline;\"\u003e\u003cem\u003eADDITIONAL SCOPE OF WORK:\u003c\/em\u003e\u003c\/span\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003e\u003cspan\u003eRemove existing damaged\u003c\/span\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cspan\u003eand rotted fascia board sections\u003c\/span\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cspan\u003eRemove deteriorated roof edge wood and surrounding materia\u003c\/span\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cspan\u003eReplace rotten fascia sections with new pressure-treated ]\u003c\/span\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cspan\u003eInstall backing\/support blocking where necessary for prope\u003c\/span\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cspan\u003eApply exterior wood sealant and primer to repaired areas\u003c\/span\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cspan\u003eRe-secure drip edge and roof edge materials\u003c\/span\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cspan\u003ePrepare repaired areas for proper gutter mounting and draining \u003c\/span\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cspan\u003eHaul away debris and perform full job site cleanup\u003c\/span\u003e\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e\u003cspan\u003eDetailed Material Cost Breakdown (Gutter Support Reinforcement)\u003c\/span\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cspan\u003ePressure Treated Fascia Boards (1x6 \/ 1x8)\u003c\/span\u003e\u003cspan\u003e\u003cbr\u003e \u003c\/span\u003e\u003cspan\u003e(Moisture-resistant replacement boards for proper gutter mounting surface) ………….. \u003c\/span\u003e\u003cspan\u003e$245\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cspan\u003eExterior Grade Plywood Backing (Reinforcement Sheathing)\u003c\/span\u003e\u003cspan\u003e\u003cbr\u003e \u003c\/span\u003e\u003cspan\u003e(Installed behind fascia to strengthen weak\/soft roof edge areas) ………….. \u003c\/span\u003e\u003cspan\u003e$185\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cspan\u003eHeavy-Duty Gutter Hangers \/ Hidden Brackets\u003c\/span\u003e\u003cspan\u003e\u003cbr\u003e \u003c\/span\u003e\u003cspan\u003e(High-load supports to ensure gutters remain securely hung and aligned) ………….. \u003c\/span\u003e\u003cspan\u003e$210\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cspan\u003eExterior Structural Screws (3”–5”)\u003c\/span\u003e\u003cspan\u003e\u003cbr\u003e \u003c\/span\u003e\u003cspan\u003e(For anchoring fascia and brackets into rafters) ………….. \u003c\/span\u003e\u003cspan\u003e$110\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cspan\u003eGalvanized Roofing Nails\u003c\/span\u003e\u003cspan\u003e\u003cbr\u003e \u003c\/span\u003e\u003cspan\u003e(Corrosion-resistant fastening for drip edge and reinforcement work) ………….. \u003c\/span\u003e\u003cspan\u003e$60\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cspan\u003eMetal Drip Edge Replacement Sections\u003c\/span\u003e\u003cspan\u003e\u003cbr\u003e \u003c\/span\u003e\u003cspan\u003e(Ensures proper water runoff into gutters and protects roof edge) ………….. \u003c\/span\u003e\u003cspan\u003e$190\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cspan\u003eConstruction Adhesive (Exterior Grade)\u003c\/span\u003e\u003cspan\u003e\u003cbr\u003e \u003c\/span\u003e\u003cspan\u003e(Adds structural bonding strength between materials) ………….. \u003c\/span\u003e\u003cspan\u003e$75\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cspan\u003eExterior Caulk \/ Waterproof Sealant\u003c\/span\u003e\u003cspan\u003e\u003cbr\u003e \u003c\/span\u003e\u003cspan\u003e(Seals seams, joints, and prevents future water intrusion) ………….. \u003c\/span\u003e\u003cspan\u003e$70\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cspan\u003ePrimer \u0026amp; Exterior Paint Touch-Up Materials\u003c\/span\u003e\u003cspan\u003e\u003cbr\u003e \u003c\/span\u003e\u003cspan\u003e(Protective coating for longevity and uniform finish) ………….. \u003c\/span\u003e\u003cspan\u003e$90\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cspan\u003eFlashing Tape \/ Waterproof Membrane\u003c\/span\u003e\u003cspan\u003e\u003cbr\u003e \u003c\/span\u003e\u003cspan\u003e(Additional moisture barrier along roofline and fascia connection points) ………….. \u003c\/span\u003e\u003cspan\u003e$100\u003c\/span\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cspan\u003eTotal Material Cost: $1,335\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cspan style=\"text-decoration: underline;\"\u003e\u003cem\u003e\u003cstrong\u003eTERMS \u0026amp; CONDITIONS\u003c\/strong\u003e\u003c\/em\u003e\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003e1. PAYMENT TERMS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cspan\u003ePayment for all approved additional repair work, including The remaining balance for the original gutter installation c Accepted payment methods may include cash, certified funds,\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003e2. CHANGE ORDERS \/ UNFORESEEN CONDITIONS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cspan\u003eAny hidden damage, structural deficiencies, wood rot, water Additional work required due to unforeseen conditions must t Discovery of hidden damage requiring repair shall not be cor\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003e3. RIGHT TO SUSPEND WORK\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cspan\u003eContractor reserves the right to suspend or delay work if:\u003c\/span\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003e\u003cspan\u003ePayment obligations are not met\u003c\/span\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cspan\u003eUnsafe site conditions exist\u003c\/span\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cspan\u003eAdditional hidden damage prevents proper installation\u003c\/span\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cspan\u003eMaterials or repairs necessary to safely complete work are\u003c\/span\u003e\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e\u003cspan\u003eAny suspension caused by customer nonpayment or refusal to a\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003e4. LATE PAYMENTS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cspan\u003eInvoices not paid within five (5) calendar days of issuance\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cspan\u003eCustomer agrees to pay all reasonable costs of collection, i\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003e5. MATERIALS \u0026amp; WORKMANSHIP\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cspan\u003eContractor agrees to furnish labor and materials in a professional Contractor is not responsible for pre-existing structural deficiencies, concealed damage, mold, pest damage, prior improper repairs, or damage is caused by weather, events or conditions outside contractor control.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003e6. PROPERTY ACCESS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cspan\u003eCustomer agrees to provide contractor reasonable access to t Any delays caused by restricted access, customer scheduling\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003e7. PERMITS \/ CODE COMPLIANCE\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cspan\u003eUnless specifically stated otherwise in writing, pricing doe\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cspan\u003eAny work required solely due to existing code violations\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003e8. LIMITATION OF LIABILITY\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cspan\u003eContractor liability shall be limited to the value to the value of services actually performed under this agreement.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cspan\u003eContractor shall not be liable for indirect, incidental, consequential, or special damages, including loss of use, water intrusion from pre-existing conditions, or delays caused by weather, suppliers, or hidden structural defects.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003e9. GOVERNING LAW\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cspan\u003eThis agreement shall be governed by and interpreted in accordance with laws of the Commonwealth of Virginia. \u003cbr\u003e\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003eAny dispute arising from the agreement shall be resolved in the appropriate court of competent jurisdiction, located in Virginia.\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003eSignature ___________________\u003c\/p\u003e\n\u003cp\u003eDate________________\u003c\/p\u003e","brand":"EliminatesPro","offers":[{"title":"Default Title","offer_id":52423844167956,"sku":null,"price":1460.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/1008\/1707\/6500\/files\/services-products-2.jpg?v=1777658485"}],"url":"https:\/\/eliminatespro.myshopify.com\/collections\/frontpage.oembed","provider":"EliminatesPro","version":"1.0","type":"link"}